Boys from the black stuff

Good job well done?

I have been walking a long a road on my way in to my local town for a few years now. The surface has been getting worse over time. The occasional botch job has put ‘chewing gum’ in a couple of holes, but as we all know this does not last a winter. A waste of time and money: a temporary fix that ought to fixed properly the first time. The madness of inspection and scheduling of work on the basis of arbitrary priorities made against a limted budget.

Imagine my surprise when I arrived home one day recently to find a road  machine ripping the surface off the road for a stretch of about 200 metres. So far so good. Obviously the road then lay in its temporary state for a week with raised inspection covers and signage on the pavements, blocking access and causing confusion for road users. Organising the job as a continuous flow would make a lot more sense.

Then it was all systems go! The road workers and machinery arrived and by the end of the day the road was complete. Bingo! At face value the job looked a good one. The resurface was well finished sealed to the existing surface. But then oh no! I walked down the road a few days later and happened to look down a drain cover. I was shocked to find it full of road chippings. On my way back I decided to look at all the drains on the road, and guess what all of them were full/blocked by road dressing. So a great job on the face of it had turned in to rework. A further job for a different team to return to site and unblock each drain. More inspection, rescheduling and prioritisation; not to mention cost.

Given the weather this year I decided to take action and logged on to my local county council web site to see how good their on line service was. It took me a while. I decided not to ring the hot line number as the council has decided to charge me for the priviledge. So, having navigated the web site I found the section I needed. Not that easy to do. I have an advantage because I know what I am looking for because I understand how council departments organise themselves. I started to enter the detail in to the web site: a tedious process. I got an acknowledgment on the site and advised that I would get a response within 10 days! This was followed a few minutes later by a standard email saying my request would be dealt with soon! More duplication, and a confusing series of messages.

Let’s hope that it does not rain too hard before the work is scheduled. The damage caused by blocked mains drains is obvious; and all caused because the job was not done correctly at the time. Bad system or sloppy workers? Ironic really that the council faces a financial crisis, and by taking sort cuts based upon unit cost it has increased its costs! Madness.

As I write the saga goes on. Watch this space.

Advertisements

Please let me know what do you think?

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out / Change )

Twitter picture

You are commenting using your Twitter account. Log Out / Change )

Facebook photo

You are commenting using your Facebook account. Log Out / Change )

Google+ photo

You are commenting using your Google+ account. Log Out / Change )

Connecting to %s